Dear Patel,
The system works correctly regarding to your customizing.
Min. Rem. Shelf Life 66
Period Ind. for SLED D
Time unit DAY
Total shelf life 270
So this mean. The shelf life is 270 days, if a material is created at 22.09.2015 + 270 days then the batch is valid until 18.06.2016.
Additionaly you defined "Min. Rem. Shelf Life" 66 days. This mean, if a batch is used in goods movement, then it must hav min 66 days shelf life.
So 18.06.2016 - 66 days mean the batch can be used in goods movements until 13.04.2016.
If we try to post today a goods movement 11.05.2016 this mean 28 days after min remaining shelf life.
System works perfectly correct.
Best Regards,
ian Wong Loke Foong