Dear Patel,

 

The system works correctly regarding to your customizing.

 

 

 

   Min. Rem. Shelf Life 66

   Period Ind. for SLED D

   Time unit            DAY

   Total shelf life     270

 

 

 

So this mean. The shelf life is 270 days, if a material is created at 22.09.2015 + 270 days then the batch is valid until 18.06.2016.

 

 

 

Additionaly you defined "Min. Rem. Shelf Life" 66 days. This mean, if a batch is used in goods movement, then it must hav min 66 days shelf life.

 

 

 

So 18.06.2016 - 66 days mean the batch can be used in goods movements until 13.04.2016.

 

 

 

If we try to post today a goods movement 11.05.2016 this mean 28 days after min remaining shelf life.

 

 

System works perfectly correct.

 